Project information
Test Piles: 2 nos. shaft grouted test bored piles 1,2m diameter, 46m deep
Mass Piles: 15 nos. shaft grouted bored piles 1,0m, 1,2m & 1,5m diameter, 46m – 57m deep
Diaphragm Wall: 110,3m diaphragm wall 0,6m & 0,8m thick, 40,50m deep
Plunge column (kingpost): 9 plunge columns with max length up to 14,25m
Project description
Project size: 20-storey and 3-level basement
Project location: 08 Ly Tu Trong, District 1, Ho Chi Minh City, Vietnam
Client:
Thanh Van Hotel Jsc
Main Contractor:
Vinata
Contractor:
Newtecons
Year:
2020