Project information

For Digestor:

  • 6 nos test bored piles 0.8m diameter, 35m deep;
  • 177 nos mass bored piles 0.8m diameter, 35m deep

For Influent Pumping Station:

  • 74.60m cicular diaphragm wall 1.2m thick, 40m deep
  • 28.93m diaphragm wall 0.8m thick, 31m depth

Jet grouting:

  • Trial JGC D1000, 37.5m length.
  • 179 nos JGC, D1000 at tunnel area, 2.9m, 4m and 25m length.
  • 679 nos JGC, D1000 in IPS, 9m length

Civil works of IPS and tunnel

PHC Pile:

  • 29 nos PHC piles D400mm, 23.8m and 28m deep;
  • 2 nos PHC piles D500mm, 28m deep.

PHC Pile at L308, M750

  • 2 nos PHC piles D400mm, 25m deep
  • 15 nos PHC piles D400mm, 11.7m deep

Project description

With a peak capacity of 34,000 cubic metres per hour, the pumping station includes biological treatment, disinfection, sludge treatment, odour treatment, and a connection to the city’s sewage system. The plant will provide wastewater treatment services for some 1.4 million people in the Nhieu Loc-Thi Nghe basin and a portion of District 2 of Ho Chi Minh City.

Project address: Vo Chi Cong, Thanh My Loi ward, District 3, Ho Chi Minh city, Vietnam 

Owner:
Ho Chi Minh City People’s Committee

Consultant:
Royal Haskoning DHV – DOHWA Joint Venture

Main Contractor:
Vinci – Acciona Joint Venture

Year:
2023