The final closing panel for more than 220m of diaphragm wall of the Lotus Tower project has been completed, ensuring quality and progress.
The project includes 5 basement floors, located right next to metro line 01 of the Ho Chi Minh city. A section of diaphragm wall has been designed in a T shape and 1.8m thick. This is the first time Bachy Soletanche Vietnam has constructed a diaphragm wall with a 1.8m grab – made specifically for this project.
Bachy Soletanche Vietnam contractor undertakes the foundation construction work (diaphragm wall and barrette piles). The Engineer unit for the project is Core Asia.