Project information

* At section Canal no. 1 to H23

– Cut-off wall:

Width: 0,6m;   Length: 183,5m

Depth: 33m average;    Total of volume: 3,630m3

– Grouting at canal no. 1:

Section of grouting: 13,5m; Total of boreholes: 27

Total length of drilling: 423m; Volume of grout: 149m3

* Main Dam: At section H23 to H30+220

– Cut-off wall:

Width: 0,6m;  Total of volume: 8 138m3 

Total length of drilling: 78 ;  Volume of grout: 24m3 

* Dam – Suoi Da:

– Cut-off wall:

Width 0,6 m; Total of volume: 2 668m3

– Grouting linking COW to sheet pile and to canal no. 2

Total length of drilling: 184 m; Volume of grout: 63m3

Project description

Project location: Tay Ninh Province, Vietnam

Owner:
Dau Tieng Irrigation
Co.

(Ministry of Agriculture& Rural Development)

Year:
1999-2000