Project information
* At section Canal no. 1 to H23
– Cut-off wall:
Width: 0,6m; Length: 183,5m
Depth: 33m average; Total of volume: 3,630m3
– Grouting at canal no. 1:
Section of grouting: 13,5m; Total of boreholes: 27
Total length of drilling: 423m; Volume of grout: 149m3
* Main Dam: At section H23 to H30+220
– Cut-off wall:
Width: 0,6m; Total of volume: 8 138m3
Total length of drilling: 78 ; Volume of grout: 24m3
* Dam – Suoi Da:
– Cut-off wall:
Width 0,6 m; Total of volume: 2 668m3
– Grouting linking COW to sheet pile and to canal no. 2
Total length of drilling: 184 m; Volume of grout: 63m3
Project description
Project location: Tay Ninh Province, Vietnam
Owner:
Dau Tieng Irrigation Co.
(Ministry of Agriculture& Rural Development)
Year:
1999-2000