👉 Journey No. 12: CAN THO BRIDGE – AFFIRMING FOUNDATION CAPABILITIES, CREATING A SOLID BASE ON THE HAU RIVER BANK  🌉✨

 

     
Alongside urban high-rise projects, Bachy Soletanche Vietnam always takes pride in contributing specialized engineering solutions to major national transport infrastructure. Among these, the Can Tho Bridge project stands as a significant milestone, demonstrating our capability to handle complex geological conditions in the Mekong Delta.
Facing thick layers of soft soil along the riverbank, the Bachy Soletanche Vietnam engineering team asserted its technical prowess through precise execution, driving bored piles deep through complex geological strata to reach absolute safe depths.
 
 
📌 Project Description:
🏢 Project: Can Tho Bridge
🕒 Construction Time: Sep2005 – 01/2006
📋 Scope of Works: Bored Piling Works – Main Cable-Stayed Pier, North Bank (Vinh Long)
  • 31 Bored Piles: Large diameter of 2.5m.
  • Record Depth: 96m deep into stable and solid geological strata.
 
 
 
 
💡 Technical Highlights:
  • Mastering RDC Technology: Successfully operating Reverse Circulation Drilling (RDC) systems and coordinating heavy rebar cages on soft riverbank alluvial soil required highly sophisticated logistics and precise alignment.
  • Optimal Borehole Wall Control: Strict control of the bentonite slurry stability was maintained, ensuring perfect borehole wall integrity at a record depth equivalent to a 30-story building through complex silt and sand strata before concreting.
  • Uncompromising Quality Commitment: Every single meter of piling was rigorously monitored for verticality deviations and concrete uniformity near the 100m mark, safely delivering all 31 mega piles right on schedule within just 5 months.
     
 
 
 
 
🌏 Significance & Legacy:
Years have passed, and the Can Tho Bridge remains a vital transport artery, driving economic growth across the entire Mekong Delta region. For Bachy Soletanche Vietnam, our greatest pride lies in the core values hidden beneath the ground, a solid, timeless foundation that stands as a testament to our commitment to quality in every project.
 
 
❓ When crossing this majestic bridge, have you ever wondered what truly defines the resilience of a mega transport infrastructure project: the magnificent cable-stayed architecture above or the robust foundation hidden below?
Let’s drop a ❤️ and share your pride in a peak engineering milestone of the Bachy family!
 
 
Bachy Soletanche Vietnam – Build On Us
Chọn nền tảng của bạn để chia sẻ tin tức!