{"id":30659,"date":"2026-04-06T10:12:11","date_gmt":"2026-04-06T03:12:11","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?p=30659"},"modified":"2026-04-10T11:24:24","modified_gmt":"2026-04-10T04:24:24","slug":"the-landmark-journey-of-bachy-soletanche-vietnam-journey-no-8-dau-tieng-reservoir","status":"publish","type":"post","link":"https:\/\/www.bachy-soletanche.vn\/en\/the-landmark-journey-of-bachy-soletanche-vietnam-journey-no-8-dau-tieng-reservoir\/","title":{"rendered":"[The Landmark Journey Of Bachy Soletanche Vietnam] \u2013 Journey No. 8: Dau Tieng Reservoir"},"content":{"rendered":"

<\/div>
\"\ud83d\udc49\"<\/span> Journey No. 8: DAU TIENG RESERVOIR \u2013 THE “WATER LUNGS” OF SOUTHERN VIETNAM AND THE MISSION TO REINFORCE SUSTAINABILITY \"\ud83d\udca7\"<\/span>\"\ud83c\udfd7\ufe0f\"<\/span><\/strong><\/div>\n
<\/div>\n
\"\"<\/div>\n
<\/div>\n
\n
\n
\n
\"\u23f3\"<\/span> Journeying back to the late 20th century, Bachy Soletanche Vietnam took its pioneering steps in hydraulic infrastructure. As the largest man-made reservoir in Vietnam and Southeast Asia, Dau Tieng is a vital “lifeline,” providing irrigation and domestic water for millions in Tay Ninh, Binh Duong, and Ho Chi Minh City. To ensure this “inland sea” remains secure against immense hydrostatic pressure, BSV implemented specialized geotechnical solutions to address critical seepage challenges within the dam body.<\/div>\n
\n
\n
<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\"\"<\/div>\n
\n
\n
\n
<\/div>\n
Mr. Le Nguyen Minh Quang, Former General Director of Bachy Soletanche Vietnam (left), presenting pioneering geotechnical foundation solutions to former President Tran Duc Luong, the Board of Directors, and partners.<\/em><\/div>\n<\/div>\n
\n
<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\"\"<\/div>\n
\n
\n
\n
<\/div>\n
Bachy Soletanche Vietnam was honored to welcome former President Tran Duc Luong to the project site. This visit stands as a testament to our company’s prestige, capability, and significant contributions to the nation\u2019s key infrastructure projects.<\/em><\/div>\n<\/div>\n<\/div>\n<\/div>\n
\n
\n
\n
<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\n
\n
\n
\"\ud83d\udccc\"<\/span> Project Description:
\n<\/strong><\/div>\n
\"\ud83d\udd52\"<\/span> Construction period:<\/em><\/strong> Executed in 3 phases (Sep 1999 \u2013 Nov 1999; Jul 2000 \u2013 Oct 2000; Nov 2000 \u2013 Dec 2000).<\/div>\n
\"\ud83d\udccb\"<\/span> <\/strong>Scope of Work:<\/strong><\/em><\/div>\n