{"id":29557,"date":"2025-11-27T10:42:38","date_gmt":"2025-11-27T03:42:38","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?p=29557"},"modified":"2025-11-27T11:00:07","modified_gmt":"2025-11-27T04:00:07","slug":"the-landmark-journey-of-bachy-soletanche-vietnam-journey-no-6-landmark-81","status":"publish","type":"post","link":"https:\/\/www.bachy-soletanche.vn\/en\/the-landmark-journey-of-bachy-soletanche-vietnam-journey-no-6-landmark-81\/","title":{"rendered":"[The Landmark Journey Of Bachy Soletanche Vietnam] \u2013 Journey No. 6: LANDMARK 81"},"content":{"rendered":"

<\/div>
\n
\n
\n
\"\ud83d\udc49\"<\/span>\u00a0Journey No. 6: LANDMARK 81 \u2013 EXPLORING THE 90-METER WORLD BELOW TO LIFT A 461-METER ICON ABOVE\u00a0\"\ud83c\udfd9\ufe0f\"<\/span>\"\ud83d\udd25\"<\/span><\/strong><\/div>\n<\/div>\n<\/div>\n<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\n
\n
\n
\u00a0<\/div>\n
Beneath the striking beauty and dazzling skyline of Vietnam\u2019s tallest tower lies an entirely different world – a 90-meter-deep underground realm where Bachy Soletanche Vietnam laid the very first foundations for a project of international stature.<\/div>\n
Most people only see the brilliance above ground, but the true beginning happens beneath it where every meter of soil is controlled, every steel cage is precisely positioned, and every barrette is installed within the allowed tolerance.<\/div>\n
Let\u2019s journey into the world only those who built it have truly witnessed where every meter of depth holds a story, every reinforcement cage marks a milestone, and from which we understand why Landmark 81 is not just the tallest tower in Vietnam but also a symbol of engineering pride and human determination.<\/div>\n<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\n
\"\"<\/div>\n
\u00a0<\/div>\n<\/div>\n
\n
\"\ud83d\udccc\"<\/span>\u00a0Project Description:<\/strong><\/div>\n
\"\ud83c\udfd9\ufe0f\"<\/span>\u00a0Landmark 81:<\/strong> 461.2 m – Top 20 tallest buildings worldwide at completion; currently ranked 15th globally.<\/div>\n
\"\ud83d\udd52\"<\/span>\u00a0Construction Timeline:<\/strong><\/div>\n
\"\ud83d\udd39\"<\/span>\u00a0Test Piles Package:<\/strong> 04\/2015 – 04\/2015<\/div>\n
\"\ud83d\udea7\"<\/span>\u00a0Pushing engineering limits – Test loads close to 9,000 tons<\/strong><\/div>\n
\u2022 Shaft grouted barrette:<\/strong> 1.0 m \u00d7 2.8 m – 80 m deep<\/div>\n
\u2022 Plain barrette:<\/strong> 1.0 m \u00d7 2.8 m – 85 m deep<\/div>\n
\"\ud83d\udd39\"<\/span>\u00a0Mass Piles Package:<\/strong> 06\/2015 – 09\/2015<\/div>\n
\"\ud83c\udfd7\ufe0f\"<\/span>\u00a0Construction of 143 barrette piles – A journey to 90 meters below ground<\/strong><\/div>\n
Detailed breakdown:<\/strong><\/em><\/div>\n
\u2022 28 shaft grouted barrettes \u2013 1.2 m \u00d7 2.8 m \u2013 85 m deep<\/div>\n
\u2022 31 standard barrettes \u2013 1.2 m \u00d7 2.8 m \u2013 85 – 90 m deep<\/div>\n
\u2022 84 standard barrettes \u2013 1.0 m \u00d7 2.8 m \u2013 85 – 90 m deep<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\n
\n
\n
\"\ud83d\udca1\"<\/span>\u00a0Technical Highlights:<\/strong><\/div>\n
\u2022 Verticality control of nearly 100 meters with deviations tighter than national standards.<\/div>\n
\u2022 Shaft grouting technology applied to enhance shaft friction capacity.<\/div>\n
\u2022 Continuous concrete pouring for hours.<\/div>\n
\u2022 Strict slurry control in complex geological conditions near the river.<\/div>\n
\u2022 Advanced O-cell load testing combined with top reaction.<\/div>\n
This is a project that every Bachy Soletanche Vietnam engineer speaks of with pride. It wasn\u2019t just construction, it was engineering at its most demanding and most real.<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\u00a0<\/div>\n
\n
\n
\n
\"\ud83c\udf06\"<\/span>\u00a0Significance & Legacy:<\/strong><\/div>\n
Landmark 81 stands tall against wind, load, and time because beneath it lies a 90-meter-deep foundation built with our full strength, expertise, and commitment.<\/div>\n
\"\ud83d\udccc\"<\/span>\u00a0People often look up at the 81 floors above\u2026 but we are proudest of the 90 meters beneath.<\/div>\n<\/div>\n
\n
\"\u2753\"<\/span>\u00a0If you stood at the foot of Landmark 81 today, what do you imagine lies 90 meters beneath your feet?<\/div>\n
\"\ud83d\udcad\"<\/span>\u00a0The power of hundreds of massive barrette piles?<\/div>\n
\"\ud83d\udcad\"<\/span>\u00a0Vietnam\u2019s leading foundation engineering technologies?<\/div>\n
\"\ud83d\udcad\"<\/span>\u00a0Or the unwavering determination of those who worked tirelessly below ground?<\/div>\n<\/div>\n
\n
Share with us what impresses you most about this cloud-touching landmark!<\/div>\n<\/div>\n<\/div>\n<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\n
\u00a0<\/div>\n<\/div>\n
\n
\"\"<\/div>\n<\/div>\n
\u00a0<\/div>\n
\"\"<\/div>\n
\n
\u00a0<\/div>\n
Bachy Soletanche Vietnam \u2013 Build On Us<\/strong><\/div>\n<\/div>\n<\/div>
<\/div><\/div><\/div><\/div><\/div>

<\/h2><\/div>

Recent news<\/p>\n<\/div>

<\/div>
<\/div><\/div><\/div>
<\/i>All news<\/span><\/a><\/div><\/div><\/div>
<\/div><\/div><\/div>