{"id":11367,"date":"2025-07-23T14:37:32","date_gmt":"2025-07-23T07:37:32","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?p=11367"},"modified":"2025-10-22T09:37:57","modified_gmt":"2025-10-22T02:37:57","slug":"kicking-off-test-pile-works-for-md3-1-residential-project-phu-my-hung","status":"publish","type":"post","link":"https:\/\/www.bachy-soletanche.vn\/en\/kicking-off-test-pile-works-for-md3-1-residential-project-phu-my-hung\/","title":{"rendered":"Kicking Off Test Pile Works For Md3-1 Residential Project \u2013 Phu My Hung"},"content":{"rendered":"

Bachy Soletanche Vietnam is honored to be selected as the test pile contractor for the MD3-1 Mixed-Use Residential Project, located in Phu My Hung \u2013 one of the most modern and exemplary urban areas in Ho Chi Minh City. The project is developed by Phu My Hung Development Corporation, a reputable investor behind many iconic developments.<\/p>\n

\"\"<\/p>\n

Bachy Soletanche Vietnam\u2019s signature red silos and concrete mixing system set up at the project site \u2013 ready for trial pile execution.<\/em><\/p>\n

Test Piling \u2013 A Crucial First Step<\/p>\n

Test piling plays a pivotal role in evaluating load-bearing capacity, assessing ground conditions, and determining optimal design parameters for the foundation system. With extensive experience in bored pile construction and complex ground engineering, our team of engineers at Bachy Soletanche Vietnam is committed to delivering precise, safe, and technically sound execution.<\/p>\n

\"\"<\/p>\n

Specialized crane preparing to lift casing pipes, marking the start of trial pile drilling at the project site<\/em><\/p>\n

Commitment to Quality from the Ground Up<\/p>\n

For us, each test pile is not only a technical trial but also a testament to our responsibility, high standards, and professional integrity in geotechnical construction. Bachy Soletanche Vietnam pledges to deliver comprehensive, high-performance foundation solutions, contributing to the overall success of the project.<\/p>\n

\"\"<\/p>\n

Overview of drilling rigs and silos arranged in sync to ensure efficiency and quality for the trial pile works<\/em><\/p>\n

\"\"<\/p>\n

Trial pile drilling in progress using advanced bored pile technology, ensuring safety and precision<\/em><\/p>\n

Advancing a Sustainable Future<\/p>\n

This project marks another milestone in our journey to support leading urban developers in Vietnam. We take pride in being a trusted partner, building solid foundations \u2013 for projects, for communities, and for the future.<\/p>\n

\"\"<\/p>\n

Aerial view of the project site showcasing the scale of works and Bachy Soletanche Vietnam\u2019s professional site organization<\/em><\/p>\n

\"\"<\/p>\n

Bachy Soletanche Vietnam\u2019s technical and project management teams working closely with the client during this crucial initial phase<\/em><\/p>\n

B<\/strong>achy Soletanche Vietnam \u2013 Build On Us<\/strong><\/p>\n<\/div>

<\/div><\/div><\/div><\/div><\/div>

<\/h2><\/div>

Recent news<\/p>\n<\/div>

<\/div>
<\/div><\/div><\/div>
<\/i>All news<\/span><\/a><\/div><\/div><\/div>
<\/div><\/div><\/div>