{"id":6963,"date":"2022-03-26T07:40:03","date_gmt":"2022-03-26T06:40:03","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?post_type=avada_portfolio&p=6963"},"modified":"2022-09-09T15:12:51","modified_gmt":"2022-09-09T08:12:51","slug":"sotetsu-hotel-2020","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.vn\/en\/offer-portfolio\/sotetsu-hotel-2020\/","title":{"rendered":"Sotetsu Hotel (2020)"},"content":{"rendered":"
Project information<\/p><\/h2><\/div>
Test Piles: <\/strong>2 nos. shaft grouted test bored piles 1,2m diameter, 46m deep<\/p>\n Mass Piles: <\/strong>15 nos. shaft grouted bored piles 1,0m, 1,2m & 1,5m diameter, 46m – 57m deep<\/p>\n Diaphragm Wall: <\/strong>110,3m diaphragm wall 0,6m & 0,8m thick, 40,50m deep\u00a0<\/p>\n Plunge column (kingpost): <\/strong> 9 plunge columns with max length up to 14,25m\u00a0<\/p>\n<\/div> Project description<\/p><\/h2><\/div> Project size: <\/strong>20-storey and 3-level basement<\/p>\n Project location: <\/strong>08 Ly Tu Trong, District 1, Ho Chi Minh City, Vietnam\u00a0 Client:<\/span> Main Contractor:<\/span> Contractor:<\/span> Year:<\/span>
\n<\/strong><\/p>\n<\/div><\/div><\/div>
\n<\/b>Thanh Van Hotel Jsc<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>Vinata<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>Newtecons<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>2020<\/span><\/strong><\/p>\n<\/div><\/div><\/div>