{"id":6811,"date":"2022-03-23T04:40:39","date_gmt":"2022-03-23T03:40:39","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?post_type=avada_portfolio&p=6811"},"modified":"2022-09-09T18:27:44","modified_gmt":"2022-09-09T11:27:44","slug":"hilton-saigon-hotel-2017","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.vn\/en\/offer-portfolio\/hilton-saigon-hotel-2017\/","title":{"rendered":"Hilton Saigon Hotel (2017)"},"content":{"rendered":"
Project information<\/p><\/h2><\/div>
Diaphragm wall: <\/strong>185,75m diaphragm wall 1,0m thick, 38,5-42,5m deep\u00a0<\/p>\n Test Pile: <\/strong>1 no test normal barrette 1,0m x 2,8m, 80m deep, max loading test 9 600 ton<\/p>\n 1 no test shaft grouted barrette 1,2m x 2,8m, 80m deep, max loading test 9 000 ton<\/p>\n Mass Barrettes: <\/strong>4 nos. normal barrettes 1,2 x 2,8m, 58,5m deep<\/p>\n 22 nos. shaft grouted barrettes 1,2 x 2,8m, 65,5m-80,5m deep<\/p>\n 5 nos. shaft grouted barrettes 1,2 x 7,3m, 77m-80,5m deep<\/p>\n Kingpost:<\/strong> 41 nos. kingposts with maximum length of 27m<\/p>\n<\/div> Project description<\/p><\/h2><\/div> Project size<\/strong>: 38-storey hotel + 5 level basement<\/p>\n Project location: <\/strong>11 Me Linh Square, District 1, Ho Chi Minh City Client:<\/span> Main Contractor:<\/span> Year:<\/span>
\n<\/strong><\/p>\n<\/div><\/div><\/div>
\n<\/b>SGCL – CORP<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>Coteccons<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>2016-2017<\/span><\/strong><\/p>\n<\/div><\/div><\/div>