{"id":6786,"date":"2022-03-23T03:24:09","date_gmt":"2022-03-23T02:24:09","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?post_type=avada_portfolio&p=6786"},"modified":"2022-09-09T18:59:40","modified_gmt":"2022-09-09T11:59:40","slug":"lancaster-lincoln-2017","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.vn\/en\/offer-portfolio\/lancaster-lincoln-2017\/","title":{"rendered":"Lancaster Lincoln (2017)"},"content":{"rendered":"
Project information<\/p><\/h2><\/div>
Diaphragm wall:\u00a0<\/strong>357m diaphragm wall 0,8m thick, 32m deep<\/p>\n Test Pile: <\/strong>1 no test shaft grouted bored pile 1,8m, 68m deep, max loading 4 713 tons<\/p>\n Mass Bored Piles: <\/strong>46 nos. normal bored piles 1,2m and 1,5m diameter, 46m-59m deep<\/p>\n 65 nos. shaft grouted bored piles 1,5m, 1,8m and 2,2m diameter with maximum depth of 82m<\/p>\n Kingpost:<\/strong> 92 nos. kingposts with maximum length of 16m<\/p>\n<\/div> Project description<\/p><\/h2><\/div> Project size<\/strong>: Two 38-storey high-end apartments + 3 level basement<\/p>\n Project location: <\/strong>428-430 Nguyen Tat Thanh, District 4, Ho Chi Minh City Client:<\/span> Year:<\/span>
\n<\/strong><\/p>\n<\/div><\/div><\/div>
\n<\/b>Trung Thuy Group<\/span><\/strong><\/b><\/p>\n<\/div>
\n<\/b>2016-2017<\/span><\/strong><\/p>\n<\/div><\/div><\/div>