{"id":6361,"date":"2022-03-12T08:28:22","date_gmt":"2022-03-12T07:28:22","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?post_type=avada_portfolio&p=6361"},"modified":"2022-09-12T09:49:26","modified_gmt":"2022-09-12T02:49:26","slug":"vincom-ho-chi-minh-block-b-2008","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.vn\/en\/offer-portfolio\/vincom-ho-chi-minh-block-b-2008\/","title":{"rendered":"Vincom HCM – Block B (2008)"},"content":{"rendered":"
Project information<\/p><\/h2><\/div>
The first project for which BSV successfully applied shaft grouted barrettes technique in Vietnam.<\/p>\n
This project possesses deepest 6-level basement in Vietnam.\u00a0<\/p>\n
Test Barrettes: <\/strong>1 nos. Test plain barrette 0,8 x 2,8m dia, 58m deep, max loading 3 060 tons 1 nos.<\/p>\n Test shaft grouted barrette 1,5 – 2,8 dia, 56m deep, max loading 2 960 tons<\/p>\n Diaphragm Wall:<\/strong> 20 060m2 diaphragm wall 1,2m thick, 48m deep<\/p>\n Mass Barrettes: <\/strong>40 nos. plain barrettes 1,5 x 2,8m dia, 54m deep<\/p>\n 98 nos. shaft grouted barrettes 1,5 x 2,8m dia, 60-78m deep<\/p>\n<\/div> Project description<\/p><\/h2><\/div> Project size<\/strong>: 28-storey building and 6-level basement<\/p>\n Project location: <\/strong>70 Le Thanh Ton, Dist. 1, Ho Chi Minh City, Vietnam Client:<\/span> Engineer:<\/span> Year:<\/span>
\n<\/strong><\/p>\n<\/div><\/div><\/div>
\n<\/b>Vingroup<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>Arup Vietnam<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>2008<\/span><\/strong><\/p>\n<\/div><\/div><\/div>