{"id":10379,"date":"2024-01-12T09:26:02","date_gmt":"2024-01-12T02:26:02","guid":{"rendered":"https:\/\/www.bachy-soletanche.vn\/?post_type=avada_portfolio&p=10379"},"modified":"2025-02-13T11:43:02","modified_gmt":"2025-02-13T04:43:02","slug":"wastewater-treatment-plant-nhieu-loc-thi-nghe-2023","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.vn\/en\/offer-portfolio\/wastewater-treatment-plant-nhieu-loc-thi-nghe-2023\/","title":{"rendered":"Wastewater Treatment Plant Nhieu Loc Thi Nghe (2023)"},"content":{"rendered":"
Project information<\/p><\/h2><\/div>
For Digestor:<\/strong><\/p>\n For Influent Pumping Station:<\/strong><\/p>\n Jet grouting:<\/strong><\/p>\n Civil works of IPS and tunnel<\/strong><\/p>\n PHC Pile:<\/strong><\/p>\n PHC Pile at L308, M750<\/strong><\/p>\n Project description<\/p><\/h2><\/div> With a peak capacity of 34,000 cubic metres per hour, the pumping station includes biological treatment, disinfection, sludge treatment, odour treatment, and a connection to the city\u2019s sewage system. The plant will provide wastewater treatment services for some 1.4 million people in the Nhieu Loc-Thi Nghe basin and a portion of District 2 of Ho Chi Minh City.<\/p>\n Project address: <\/strong>Vo Chi Cong, Thanh My Loi ward, District 3, Ho Chi Minh city, Vietnam\u00a0 Owner:<\/span> Consultant:<\/span> Main Contractor:<\/span> Year:<\/span>\n
\n
\n
\n
\n
\n<\/strong><\/p>\n<\/div><\/div><\/div>
\n<\/b>Ho Chi Minh City People\u2019s Committee<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>Royal Haskoning DHV – DOHWA Joint Venture<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>Vinci – Acciona Joint Venture<\/span><\/strong>
\n<\/strong><\/span><\/b><\/p>\n<\/div>
\n<\/b>2023<\/span><\/strong><\/p>\n<\/div><\/div><\/div>